| Click
here to download a printable copy of our assessment questionnaire.
|
| Manufacturing
Flow |
| 1.
Does material flow in one direction throughout the plant?
|
| 2.
Is the manufacturing process designed to have operators touch material
only one time?
|
| 3.
Are production areas aligned to end-customer products?
|
| 4.
Are work centers designed to meet daily customer requirements?
|
| 5.
Is product passed between operations one piece at a time?
|
| 6.
Is the flow of production visible and understandable?
|
| 7.
Do operators flex between work centers?
|
| 8.
Is manufacturing synchronization (value-added time/total mfg. cycle
time) at least .75?
|
| Organization
|
| 1.
Are flow path leaders held accountable for end-product performance
results?
|
| 2.
Are cross-functional teams used on the flow path?
|
| 3.
Are the roles/responsibilities for all team members defined and
documented?
|
| 4.
Do operators know all steps in the flow process for their areas?
|
| 5.
Are support roles clearly defined and involved in flow path efforts?
|
| 6.
Is there a systematic two-way communication process?
|
| 7.
Is management conducting performance appraisals based on flow performance?
|
| 8.
Is compensation linked to performance?
|
| Continuous
Improvement |
| 1.
Are changeover times on bottleneck resources less than 10 minutes?
|
| 2.
Is there a defined continuous improvement program?
|
| 3.
Is response time less than 15 minutes for defects found in the production
process?
|
| 4.
Do team members have the authority to stop the flow path when defects
are discovered?
|
| 5.
Is the company philosophy "Everything has a place and everything
in its place"?
|
| 6.
Are stretch goals included in performance metrics?
|
| 7.
Are work instructions and product quality specifications visible
at all work areas?
|
| 8.
Are timetables posted for preventative maintenance or continuous
improvement efforts?
|
| Metrics
|
| 1.
Are performance measures visible and current on the flow path?
|
| 2.
Are updated charts on productivity, quality, safety, and problem
solving visible for teams?
|
| 3.
Is performance reviewed daily by flow path teams?
|
| 4.
Is schedule adherence 100% on time?
|
| 5.
Are manufacturing cycle times less than one day?
|
| 6.
Is the flow path performance continually improving?
|
| 7.
Do flow path work center operators own and report their performance
data?
|
| 8.
Are performance metrics linked to financial metrics?
|
| Global
Supply Chain
|
| 1.
Do production areas build to customer demand?
|
| 2.
Is material pulled between stations?
|
| 3.
Does the shop floor produce to a daily build schedule?
|
| 4.
Is material replenished to an A,B,C segregation?
|
| 5.
Are shop floor operation planning rules documented and understood?
|
| 6.
Are firm planning cycle times less than one day?
|
| 7.
Is a supplier certification process, with measurements, displayed?
|
| 8.
Does the daily build plan meet customer and financial commitments?
|